The Kraftszer Ltd. has successfully finished the installation of the biomass feeding system, which was fitted to the existing fluid-bed boiler in the ATEL power plant at Zlin.
The Provisional Acceptance was held on 11. 06. 2009. The project was realized technically irreprehensible for the satisfaction of the ATEL leadership. The 24 month guarantee period started.