Kraftszer Ltd. gained a new tender at Dunamenti Power Plant, where new hot water boilers will be installed for district heating supply.
The job is complex, which includes the design, authorization and implementation of two hot water boilers and auxiliary equipment. Customer’s target with execution of new boiler settlement to be able to secure the district heating in safe and permanently during downtime of their existing energy blocks. This service shall be done independently from the Power Plant Dunamenti, too.