Ipari technológiák-06

新闻

Installation of a steam boiler block in the Dunamenti Power Plant

2013. April 26. Friday

Installation phase of a new steam boiler block has begun at Dunamenti Power Plant. Kraftszer Ltd. as main contractor provides turnkey operation of a 22t/h boiler room.

As part of the architecture, mechanical engineering, electrical and I&C tasks our company is also responsible for building permit plans, engineering, site construction, complete installation and commissioning.

The boiler room will be able to produce 22 t/h steam overheated to 300 0C at 15 barg over-pressure, its heat demand will be ensured by a Bosch UNIVERSAL UL-SX 22.000 steam-boiler and supplemental units.

Expected date of completion of the project is 30 September 2013.

Erőművek, ipari energetikai- és technológiai létesítmények kivitelezője