任务:
Making tender plan of process piping system to area of Bridgestone Tatabánya Tire Firm.
Designing content :
Main areas of the planing task have been following:
- Stress analysis
- Arrangement and parts planning
- Architectural and stealstructural plannings
The process and auxiliary pipeworks have been all area of firm and auxiliary buildings. We have installed the operating pipe bridge onto pillars and roofbeams system of main building in 10 metres high.
客户
Takenaka
地点
2800 Tatabánya