Budapest Power Plant Gas turbine installation at Kelenföld Power Plant- Feasibility study

Budapest Power Plant Gas turbine installation at Kelenföld Power Plant- Feasibility study

任务:

We have made feasibility studies of gasturbine-generator unit in 5 versions which is Alstom/Siemens Thyphoon SGT- 100 gasturbine unit with 5 MWe performance.

Scope of designing:

In case of 5 versions the main parts of the tender designing have been the followings:

  • P&I diagram
  • Energetic data analysis
  • Arrangement plans
  • Technical description
  • Cost-benefit analysis
  • Summation of benefits and disadvantages
  • Designing content

After the field appointments we have determinated the installation places and made arrangement plans for the versions. We have defined 5 versions which have been different the installation places and built in equipments. We have prefered the existing buildings for the installations (ex.: old boiler house). We have made cost-benefit analysis and operation cost analysis about the selected versions. As well as, we have estimated the benefits and disadventiges with decision matrix and we have recommended one version to the customer.

客户

Budapesti Erőmű Zrt.

地点

1117 Budapest, Budafoki út 52.

开始运营

2008-01-01

Erőművek, ipari energetikai- és technológiai létesítmények kivitelezője