Design and implementation of gas boiler building in Tiszapüspöki

Design and implementation of gas boiler building in Tiszapüspöki

任务:

Establishment of gas boiler building of the grain processing factory’s boiler plant planned to be built up in the periphery of Tiszapüspöki


Scope of work:

Designs required for the project (architecture, machinery, electricity and control engineering), complete implementation and installation works


Technical specification :

2 pcs Bosch UL-SX 25t/h steam boiler, whose fuel may be natural gas, bio-gas or alcohol


Client:      Tisza-TK Projekt Kft.


Schedule:  2016.01. – 2017.04

客户

Tisza-TK Projekt Kft.

地点

5211 Tiszapöspöki

开始运营

2017-10-30