任务:
The rebuilding of the existing traditional boiler-house, to a 24 hours operation without supervision.
Content:
The designing, authorising, full-scale installation and commissioning of the boiler-house.
Scope of supply:
P&I diagram, technical descriptions for the control system, authorisation and detailed design.
MAIN EQUIPMENTS:
- 2 pcs 12 t/h, and 1 pcs 7 t/h capacity Láng steam-boiler with combined duoblock burner, steam-devider vessel with its equipments, pipelines with holders and insulation, auxiliary equipments, electrical equipments, control units and system.
Description:
The boiler-house ensure the whole heating energy and the 4 bar technological steam demand of the Opel Car factory in Szentgotthard. The rebuilt heat centre operates 24 hours without supervision. The built-in sub-systems ensure the automatic operation of the main equipments without supervision (eg.: condens-level control, blow-down of boilers, continuous checking of the salinity and conductance of district water).
客户
Opel
地点
9970 Szentgotthárd, Füzesi út 15.
开始运营
1991-01-01