Tiszapüspöki, Execution of the interconnection pipelines between the plants

Tiszapüspöki, Execution of the interconnection pipelines between the plants

任务:

Machinery design and implementation works of pipe bridge in the area of the grain-processing factory in the periphery of Tiszapüspöki


Scope of work:

Complete design works (machinery) required for the project


Technical specification :

  • 900 m track length
  • 10 km pipeline

  • DN25-DN600 size range

  • PN16-PN25 pressure rating


Client:       Tisza-TK Projekt Kft.


Schedule:  2016.10. – 2017.04