Pannon-Hő Kft. belonging to PannonPower Holding is the first enterprise in Hungary building a straw-fired block in the Heat Power Plant of Pécs city. Pannon-Hő Kft. has concluded a contract with Kraftszer Kft. as General Contractor for the execution of this project. Trial run of the new 35 MW-block starts in September 2012 and commercial operation in December 2012.
