Ipari technológiák-06

News and stories

P&G Hyginett Ltd. - Feasibility studies of the trigeneration power plant

2009. February 02. Monday

The Engineering division of Kraftszer Ltd. has prepared the first phase of the feasibility study for the trigeneration power plant at P&G  Hyginett Ltd.’s Csömör site. At this stage we delivered the so-called basic plan, that is needed for the decision-making, which contains the fundamental economic and energy calculations, as well as the information about the installation and investment of the power plant.

Erőművek, ipari energetikai- és technológiai létesítmények kivitelezője