Tasks:
Design and installation of a 1000m3 woodchips silo and feeding system to supply the existing boiler.
Customer:
ALPIQ Zlin
Power Plant Content The full scale designing, installation and commissioning of the biomass receiving, storing and feeding system as general contractor. - technological design(P&I), - mechanical, control and instrumentation, power supply design - manufacturing, purchasing, installation - commissioning, trial run, - education, - final documentation
Description of the project:
The woodchips is delivered by tracks to the power plants. It goes to a hopper from which case-belt conveyor brings it into the 1000m3 silo. The other conveyor system brings the woodchips from the silo to the fluid-bed boiler. The Wall screw is feeding the chips into the boiler. The installed Rotary Air Lock is preventing the backflow of the combustion air. The system was designed for 5 t/h capacity.
Client
Alpiq
Address
763 26 Zlin
Operation start
2009-07-27