Tasks:
Implementation of complete utility systems (steam, hot water, cooling water, chilled water, compressed air, N2 and vacuum system), Mechanical commissio-ning of systems with main equipment.
Technical specification :
Boiler capacity: 3 x 8 MW (3 x 12 t/h)
Chiller capacity: 8 x 2 MW
Client : Apollo Tyres Hungary
Client
Apollo Tyres Hungary
Address
3212 Gyöngyöshalász
Operation start
2016-01-01