Tasks:
Establishment of gas boiler building of the grain processing factory’s boiler plant planned to be built up in the periphery of Tiszapüspöki
Scope of work:
Designs required for the project (architecture, machinery, electricity and control engineering), complete implementation and installation works
Technical specification :
2 pcs Bosch UL-SX 25t/h steam boiler, whose fuel may be natural gas, bio-gas or alcohol
Client: Tisza-TK Projekt Kft.
Schedule: 2016.01. – 2017.04
Client
Tisza-TK Projekt Kft.
Address
5211 Tiszapöspöki
Operation start
2017-10-30