Design and installation of combined cycle auxiliary equipments (Balance of Plant) as a part of Dunamenti Power Plant G3 Repowering project.

Design and installation of combined cycle auxiliary equipments (Balance of Plant) as a part of Dunamenti Power Plant G3 Repowering project.

Tasks:

Kraftszer Ltd. designed and installed combined cycle auxiliary equipments (Balance of Plant) of G3 block as a part of Dunamenti Power Plant G3 Repowering project on the territory of Dunamenti Power Plant, Százhalombatta.

Customer: Dunamenti Erőmű Zrt.

Scope of Supply

This project connected to ten systems (full or partiall scope), see below:

  • Closed cooling water system – full scope
  • Waste system - partly
  • Technological water piping - partly
  • Water system - partly
  • Compressed air system - partly
  • Gas turbine vents - partly
  • Instrument air system - partly
  • Cooling system (water side) of control oil - partly
  • Fuel oil supply system - partly
  • Steam supply of building heating system - partly

Description of the facility

Above systems and subsystems are the parts or auxiliary systems of the combined cycle steam/gas G3 Unit.

Systems no. 1, 2, 3, 5 are contain pumps, pipe sections, on-off valves, control valves, strainers, heat exchangers, C&I equipments, electrical motors, engines; systems no 4, 6, 8, 9, 10 are contain -essel pipe sections, on-off valves, control valves, strainers, C&I equipments, electrical motors.

Client

GDF suez

Address

2440 Százhalombatta, Erőmű út 2

Operation start

2011-01-01

Erőművek, ipari energetikai- és technológiai létesítmények kivitelezője