HUNGRANA implementation of CHP system

HUNGRANA implementation of CHP system

Tasks:

The installation of the Turbomach turbine set and the heat utilization boiler.

Customer Hungrana Ltd.

Content:

The installation of the Solar-Turbomach gas turbine generator set procured by the Customer-, and mechanical engineering, electrical and I&C fittings of the HRSG.

Scope of supply:

Preparing licensing and implementation plans on the basis of the equipment procured by the Customer. Permit and consent procedures (authorities and professional bodies). Fulfilling implementation works that includes the preparation of the basement, the installation of the feeding gas system with filter and the gas compressor (provided also by the Customer). Establishing power supplies with built-in transformer and adapting to the Customer’s I&C system.

Description of the establishment :

The power of the built-in turbine: Electrical power: We= 15 MW Thermal power: Wth= 28 MW

Client

Hungrana Kft.

Address

2432 Szabadegyháza, Ipartelep

Operation start

2007-01-01