HUNGRANA Installation of CGF dryer

HUNGRANA Installation of CGF dryer

Tasks:

Installation of CGF dryer

Customer: Hungrana Ltd.

Content:

Installation and mechanical engineering, electrical and I&C fittings of the CGF dehumidifier (DEDERT) and dryer technology (SwissCombi) that was procured by the Customer.

Scope of supply:

Preparing licensing and implementation plans on the basis of the equipment procured by the Customer. Fulfilling implementation works that includes the preparation of the basement, the building and the technological installation of the steel framework.

Description of the establishment:

After receiving the end product of the bio ethanol production (CGF) the water is separated by a compression procedure. Then the CGF is dried out with an energy saver dryer system (SwissCombi patent rights conform), and it is delivered to the given storage building on a conveyor-belt system.

Client

Hungrana Kft.

Address

2432 Szabadegyháza

Operation start

2007-01-01

Erőművek, ipari energetikai- és technológiai létesítmények kivitelezője