Tasks:

Preparing the feasibility study for a trigeneration energy center at Procter & Gamble Ltd.’s Csömör site. Scope of designing The main parts of the tender designing are the followings: P&I diagram Energetic data analysis Selecting installation Arrangement plans Technical description Cost-benefit analysis Rate of return analysis Designing content After the field appointments we have determinated the actual technical parameters of the site and made the heat performance – heat output diagram. Using the technical parameters from the diagram, we have determinated the main equipments’ parameters of the trigeneration energy centre and installation places. We have made the basic arrangement plan for the selected equipments, the project and the operation costs. Beyond that, we have also attached the rate of return analysis.